top of page

Los Patrones New Alignment

Los Patrones – New Alignment Pavement Design

Project Highlight


GMU provided comprehensive pavement engineering, geotechnical engineering, and construction observation and testing services for the 5-mile-long new alignment along Los Patrones Parkway in South Orange County, California. The recommended pavement structural section reduced construction costs by approximately 40 percent, which involved the construction of a cement-treated soil layer utilizing on-site materials as the foundational layer, an aggregate base layer to address soil-cement shrinkage reflective cracking potential, and asphalt concrete surfacing. 





Commentaires


bottom of page