GMUgeo
Oct 1, 20141 min
Updated: Jan 22, 2023
Check out the construction of a 288-foot long arch culvert which will serve as a pedestrian under-crossing in Rancho Mission Viejo. The floor of the culvert was just poured. GMU is providing the geotechnical design and construction services, in addition to special inspection for the reinforced concrete. Stay tuned for updates as the work progresses