Warning: count(): Parameter must be an array or an object that implements Countable in /home/customer/www/gmugeo.com/public_html/wp-content/plugins/soliloquy-dynamic/includes/global/shortcode.php on line 215

Public Works Projects

GMU has an extensive resume for geotechnical instrumentation and monitoring of highly visible Public Works projects throughout California. These projects include:

  • Main Street Bridge (Pile Driving), Temecula
  • San Diego Creek Revetment Stabilization (Sheet Pile Driving),Irvine, CA
  • Edinger Channel (Deep Shoring) , Huntington Beach, CA
  • Marina Park (Sheet Piles, Stone Columns), Newport Beach, CA
  • Black Mountain Road (Blasting), San Diego, CA
  • Highway 1/38 Big Bear Dam Arch Bridge (Blasting), Big Bear City, CA
  • Hwy 138 Widening (Blasting) , Wrightwood, CA
  • All American Asphalt Quarry, (Blasting), Corona, CA

Instrumentation for these projects included one or more of the following: sound monitoring, vibration monitoring, inclinometers and tiltmeters.