San Diego Creek Channel Invert Repair Project – Irvine, CA

GMU provided vibration monitoring services for Shimmick Construction Company during the sheet pile installation operations along the San Diego Creek channel embankments to repair the channel invert. Sheet piles were driven with a vibratory hammer immediately adjacent to existing channel improvements and within 50 feet of residential structures.