TCWD Spillway Replacement Design

GMU Structural has recently completed the geotechnical investigation, structural design, details, construction bidding oversight, construction observation, and special inspection services for the reconstruction of a failed spillway for the Trabuco Water District. Full structural design comprised of reinforced concrete upper and lower head walls and a reinforced shotcrete spillway deck. GMU Structural provided all the construction specifications and provided value engineering throughout the project.